Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cxvdff/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cxvdff/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the polylang domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cxvdff/public_html/wp-includes/functions.php on line 6114
12 Pars khodro color saloon - ضیاگستر

12 Pars khodro color saloon

Client: Parskhodro Co.

Contract period: 10 Months.

Scope of work:

Local & Foreign Procurement
Commissioning

Brief Description:

-Installation & commissioning of 10 number of
transformer 1600 KVA.
-Installation & commissioning of 17 MV & 57 LV
cells.
-wiring of 5Km medium & 15km low voltage
cables.
-Installation of45 distribution panels.
-Installation of 8Km cable ladder.
-Installation & commissioning of 500KVAR bank
capacitor.
-Installation & commissioning of different kind of
control valves.
– Installation & commissioning of 3 Boiler
machinery.
– Installation & commissioning of 2 Chiller.
-Installation & commissioning of different sensors
such as
-Installation limit switch, photo switch, pressure
switch
-Supplementary electricity of 6 water wells