Electrical and mechanical installation of engine-producing saloons :

Electrical and mechanical installation of cooling and heating saloons. Heating systems of engine-producing saloons Electrical and mechanical installation of Waxshop & L-90 saloons. Repair and maintenance of heat and cold installation Installation and launching chiller 120T Plumbing gas oil line and lagging exhibition saloon Installation administrative organization’s mechanical room Water & Wastewater Network Installation of heating drilling, water plumbing

Electrical and mechanical facilities of engine building hall 3

The electrical facilities of this project include supports in different sizes, cable laying in different sizes, main wall and lighting panels, and fluorescent and industrial lights for general and local lighting systems. The mechanical facilities of this project include piping for drinking water – industrial water – compressed air. Installation of air washers, ducting, and pipe and channel insulation. The approximate area of the hall is about 40,000 square meters and it is located in Iran Khodro Company.

Electrical and mechanical installations of the cooling and heating system of Trim 1 and 2 salons

The electrical installations of this project include supports and trays, cabling in different sizes, standing panel-wall lighting, and fluorescent and industrial lights for general and local lighting systems.

The mechanical facilities of this project include plumbing of mastic water – industrial water – compressed air, installation of 2 air washers, ducting and insulation of pipes and channels, the main volume of which is ducting and insulation. The approximate area of the hall is about 80,000 square meters and it is located in Iran Khodro Company.

The radiant heating system of engine room 2

This project includes heating units of SLAR and ARUT models in engine room number 2. This system has high heating, no maintenance and repair costs, and its fuel is gas. 45 ARUT model devices and 27 SL AR model devices have been installed in this hall.

Electrical and mechanical installations of L-90 decoration salon and Wax Shop

The electrical facilities of this project include a fire alarm, paging, telephone, public, local, and emergency lighting, and related cabling. The mechanical facilities of this project include drinking water piping – industrial water-compressed air, installation of water coolers and water coolers and furnaces. The weather is hot. The approximate area of the hall is about 30,000 square meters and it is located in Iran Khodro Company.

Electrical and mechanical installations of the L-90 completion hall and administrative annex and test road

The electrical facilities of this project include the telephone system, public and local lighting, and related cabling.

The mechanical facilities of this project include piping of drinking water, industrial water, compressed air, and installation of water coolers and air conditioners of Shazkat Eruka. The approximate area of the hall is about 20,000 square meters and it is located in Iran Khodro Company.

Other items implemented on this site:

  • Construction of electrical installations of the delivery hall
  • Insulation of pipes and chimneys of the riding hall
  • Piping with steel pipes for the heating line and the main line of phosphate hall tanks
  • Plumbing and insulation work in the exhibition hall
  • Installation and start-up of the central engine room of the lift truck hall and the General
  • Department of Electricity and Transportation Affairs
  • Installation and start-up of the engine room of the transport repair hall No. 2
  • The facilities of Excel Hall include heating, drinking water, and industrial plumbing offices
  • Installation and start-up of the engine house located in Koel Hall
  • Installation and commissioning of the administrative organization engine room
  • Implementation of all piping related to engine houses and installation and start-up of 120-ton chiller
  • Reconstruction, repair, and maintenance of heating and refrigeration facilities
  • Implementation of water piping in different parts of the factory
  • Implementation of raw water piping in Pikan Shahr.