Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cxvdff/public_html/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/cxvdff/public_html/wp-includes/functions.php on line 6114
Asaluyeh Site - ضیاگستر

Asaluyeh Site

Implementation of HVAC installation and commissioning of Phase 6 and 7 gas pressure boosting station and Control Room Substation.

– Client: Turbo Compressor Oil Company

– Consultant: Quds Niro Consulting Engineers Co., Rahab Consulting Engineers Co.

The mechanical facilities of this project include ducting and insulation work, plumbing with copper pipes and insulation work, installation of air conditioners, air condensers, condensing units, engine dampers, fire dampers, exhaust fans, fresh air installations, oil charging and gas injection. The electrical facilities of this project include plumbing with conduit pipes, support and trays, installation of main and control panels, and installation and commissioning of PLC.