latest projects
Installation and performance of electric equipments in kashan site
Client :Saypa Co.
This project consist of main power substations .these substation are , color saloons , passages ,montage and body .all of these parts are 54 cell( 2 kv) , 70 LV cells and 25 transformator(2000 kva) with wiring LV & MV cables.
Payam Airport site
Client : Payam Economic zone
Underconstruction installation of payamairport special zone .Client : payam aviation services Co .Consultant : Araman shahr advisorengineering Co .Power network : consist of establishing LV& MV networkWater network :Waste water networkGas networkTele communication networkFundamental installation
.
Iran khodro site
Consultant : Puyesh tak pars ,Energy ,Jarf andishan advisor engineering Co. Electrical and mechanical installation of engine producing salloons : Electrical and mechanical installation of cooling and heating salloons . Heating systems of engine producing salloons Electrical and mechanical installation of Waxshop & L-90 salloons. Repair and maintenance heat and cold installation Installation and launching chiller 120T Plumbing gas oil line and lagging exhibition saloon Installation administrative organization’s mechanical room Water & Wastewater Network Installation of heating drilling,water plumbing
Khormoj electrical system of pressure gas station
Client: N.I.O.C
Contract period: 12 MonthsScope of work: Local &ForeignProcurementConstructionCommissioning
Brief Description:
These stations are located on the way ofgas 56 transfer linesWhich transfer torash gas from Asaloyeh toAghajari oil wells, located in Booshehr, eachof these stations consist of four turbocompressor (3operation+1Standby) which aremade by Siemens Co.